The trailhead parking lot is being used as a staging area for the East Bench pipeline work. The trail itself stays open to pedestrians along a designated route.

Trail OpenTo Pedestrians
Parking Closed22nd Street Trailhead Lot
Parking lot closed May 1, 2026 – Spring 2027

Trail Access & Parking

Trail access remains open via a designated route. Certain trail sections along active work are closed and posted. Please follow all signs and barricades.

Please use alternate parking at:

What to Expect

  • Construction begins at the west end of the project area and moves toward 22nd St. See the map below for details.
  • Ongoing excavation and construction along the trail, with noticeable noise and dust.
  • Daytime work hours: Monday – Friday, Saturday as needed.
  • Follow all posted signs and barricades for your safety.

Important notice — heavy truck traffic

Expect a significant increase in large construction trucks on 21st and 22nd St.

  • Trucks will be traveling in and out frequently throughout the day.
  • Please use extra caution when driving, walking, or biking.
  • Expect delays, noise, and dust.

Project Map

Map of the East Bench pipeline project area showing trail closures and the 22nd Street Trailhead

Select the map to open the full-size trail closure map (PDF).

Questions?

Contact the dedicated project hotline with any questions or concerns:

Thank you for your cooperation during this phase of our project.